Report for Quarter Ended 30 June 2010
26 JUL 10
CEO COMMENTS
Production during the Quarter averaged 8,207 BOEPD, down 5% compared to the previous quarter. ROC is on target to meet its 2010 production guidance of between 8,000-9,000 BOEPD: year-to-date production to 18 July was 8,545 BOEPD.
Production from Zhao Dong improved significantly, recovering after severe winter weather disruptions and achieving production rates that exceeded 25,000 BOPD at Quarter-end. The level of facility downtime due to unplanned maintenance at the Basker-Manta-Gummy ("BMG") and Enoch fields during the Quarter was disappointing.
Year-to-date sales revenue of US$100.2 million strengthened ROC’s net cash position to US$52.7 million at Quarter-end. However, development and exploration expenditure is planned to increase during 2H 2010. Exploration and appraisal activity in 3Q 2010 will include the drilling of the Tuatara-1 exploration well in New Zealand and the drilling of the Castanha-2 appraisal well in Angola.
Progress continued on the Beibu Gulf project during the Quarter: commercial terms for sharing facilities with CNOOC were agreed; documentation of the Supplemental Development Agreement progressed; and internal CNOOC review and approval processes continued. First oil production at the Beibu Gulf project is anticipated in 2H 2012.
Engineering evaluation of development options for the BMG Phase-2 Gas project continued during the Quarter.
KEY ACTIVITIES
1. CONSOLIDATED REVENUE & PRODUCTION
1.1 Total working interest production of 0.747 MMBOE (8,207 BOEPD); down 4% compared to 0.780 MMBOE (8,667 BOEPD) in the previous quarter.
1.2 Sales volumes of 0.647 MMBOE; down 4% compared to 0.675 MMBOE in the previous quarter. ROC’s net crude oil underlift position at Quarter-end increased by 0.1 MMBOE to 0.3 MMBOE.
1.3 Total sales revenue of US$50.8 million; up 3% compared to US$49.3 million in the previous quarter.
1.4 Average realised oil price (excluding hedging) in the Quarter of US$78.68/BBL; up 5% compared to US$74.82/BBL in the previous quarter. The Brent crude oil price averaged US$78.24/BBL in the Quarter.
2. PRODUCTION ASSETS
2.1 Zhao Dong C & D Oil Fields, Bohai Bay, Offshore China (ROC: 24.5% & Operator)
Gross oil production averaged 16,633 BOPD (ROC: 4,075 BOPD); up 33% compared to the previous quarter, in which production was affected by severe winter weather conditions. The 2010 drilling programme also contributed to increased production during the Quarter.
The production rate from both the C&D and C4 fields in the final week of the Quarter averaged approximately 25,250 BOPD.
2.2 Zhao Dong C4 Oil Fields, Bohai Bay, Offshore China (ROC: 11.575% unitised & Operator)
Gross oil production averaged 3,035 BOPD (ROC: 351 BOPD); up 964% compared to the previous quarter, in which production was affected by severe winter weather and the failure of a power cable from the Zhao Dong facilities to C4 platform. The drilling of two new wells and workovers on two existing wells contributed significantly to production during the Quarter.
2.3 Cliff Head Oil Field, WA-31-L, Offshore Western Australia (ROC: 37.5% & Operator)
Gross oil production averaged 4,431 BOPD (ROC: 1,662 BOPD); down 2% compared to the previous quarter. Planning has commenced for a possible workover in 4Q 2010 to install a higher-rate downhole electric submersible pump at the CH12 production well.
2.4 Basker-Manta-Gummy ("BMG") Oil and Gas Fields, VIC/L26, VIC/L27 & VIC/L28, Offshore Victoria (ROC: 30% & Operator)
Gross oil production averaged 1,513 BOPD (ROC: 454 BOPD); down 70% compared to the previous quarter. During the Quarter, the field was shutdown for approximately eight weeks due to maintenance and repair activities on the Crystal Ocean FPSO.
A planned shutdown took place in April, during which the Crystal Ocean FPSO entered dry-dock for thruster repairs and maintenance activities. In early May, production was further disrupted while repairs to the Crystal Ocean FPSO’s disconnectable turret mooring and mooring buoy were completed.
The field came back online in early June following completion of these repairs and the production rate in the final week of the Quarter averaged approximately 4,700 BOPD.
2.5 Blane Oil Field, North Sea (ROC: 12.5%)
Gross oil production averaged 7,325 BOPD (ROC: 916 BOPD); down 28% compared to the previous quarter due to a field shutdown related to planned maintenance activities in the area, which took place throughout June as previously advised.
While production was re-established in early July, further planned repair work on the gas lift pipeline has necessitated another shut-in of production for precautionary safety reasons. Normal production with gas lift capability is planned to resume in early August.
2.6 Enoch Oil and Gas Field, North Sea (ROC: 12.0%)
Gross oil production averaged 3,778 BOPD (ROC: 453 BOPD); down 37% compared to the previous quarter due to natural field decline and facility limitations that interrupted and restricted gas lift supply from the Brae host platform. Repairs to the Brae host platform’s gas lift supply system are expected to be completed during 3Q 2010.
2.7 Chinguetti Oil Field, PSC Area B, Offshore Mauritania (ROC: 3.25%)
Gross oil production averaged 7,853 BOPD (ROC: 255 BOPD); down 8% from the previous quarter due to natural field decline.
3. DEVELOPMENT ASSETS
3.1 WZ 6-12 and WZ 12-8 West Oil Field Development (Block 22/12 Petroleum Contract), Beibu Gulf, Offshore China (ROC: 19.6% & Operator)
Following completion of the technical section of the Overall Development Plan ("ODP") in December 2009, negotiations on commercial terms were completed during the Quarter. The agreement with China National Offshore Oil Company Limited ("CNOOC") specifies terms, conditions and tariffs for the joint development of the two fields. CNOOC has elected to participate for its full 51% share in the development and ROC’s share will be 19.6%.
The agreed commercial terms have been incorporated into a revised ODP, which is presently subject to Expert Review with CNOOC. A Supplemental Development Agreement ("SDA") to the Petroleum Contract to include the agreed commercial terms is also currently being prepared within CNOOC.
The Final Investment Decision and formal Chinese Government approvals for the project are expected once the SDA has been signed. First oil production is anticipated in 2H 2012.
3.2 Zhao Dong C & D Oil Fields, (ROC: 24.5% & Operator) and C4 Oil Field (ROC: 11.575% unitised & Operator), Bohai Bay, Offshore China
The 2010 drilling programme continued throughout the Quarter on schedule and within budget: nine (seven producers and two injectors) of the planned 24 wells have now been completed and another two are currently being drilled.
Installation of the gas export pipeline and facilities commenced during the Quarter and gas deliveries are planned to begin in 4Q 2010, eliminating the need for gas flaring during normal operations.
3.3 Basker-Manta-Gummy Oil and Gas Fields, VIC/L26, VIC/L27 & VIC/L28, Offshore Victoria (ROC: 30% & Operator)
The Joint Venture continues to assess various options for the potential future development of the field’s gas resource.
4. EXPLORATION AND APPRAISAL ASSETS
4.1 PEP38524, Offshore Taranaki, New Zealand (ROC: 15%)
Roc Oil (Tasman) Pty Limited, a wholly owned subsidiary of ROC, farmed into PEP38524 during the Quarter. ROC will contribute towards the cost of the Tuatara-1 exploration well to earn a 15% participating equity interest in the permit.
Tuatara-1 is targeting approximately 80 MMBBL of potential recoverable oil reserves in a typical Taranaki Basin-style trap similar to the producing Maari oil field. Tuatara-1 is expected to be drilled during 3Q 2010.
4.2 PEP52181, Offshore Taranaki, New Zealand (ROC: 50% & Operator)
The New Zealand Ministry of Economic Development granted PEP52181 to ROC and its joint venture partners during the Quarter. The permit contains the Kaheru prospect, which is on trend with the Rimu oil and gas field and Kauri gas and condensate field. The prospect has 3D seismic coverage and the agreed work programme for the five-year term includes an exploration well (Kaheru-1) by the end of year three.
4.3 WA-286-P & WA-31-L, Perth Basin, Offshore Western Australia (ROC: 37.5% & Operator)
The WA-286-P Permit Renewal Application was submitted on 22 April. Pre-stack Depth Migration processing of 150km2 of the Diana 3D seismic survey in WA-286-P is nearing completion and interpretation of the data over structures in the vicinity of the Frankland gas discovery will be undertaken during 3Q 2010.
In WA-31-L, 220km of reprocessed 2D seismic data is being interpreted in conjunction with the Cliff Head Field 3D survey to assess near-field exploration potential.
4.4 WA-351-P, Carnarvon Basin, Offshore Western Australia (ROC: 20%)
The Permit Renewal Application, which included a 50% relinquishment preserving the best leads, was submitted on 1 April. The permit was renewed on 28 June for a five-year term. An exploration well is committed by the end of year three (mid-2013).
4.5 VIC/P49, Gippsland Basin, Offshore Victoria (ROC: 20%)
The VIC/P49 permit expired effective 15 April.
4.6 PEP38259, Canterbury Basin, Offshore New Zealand (ROC: 15%)
The Joint Venture is obliged to commit by 17 August 2010 to drill one exploration well within the following 12 months or the permit will be relinquished. The Barque-1 prospect is currently being considered as a potential candidate.
4.7 WA-381-P and WA-382-P, Vlaming Basin, Offshore Western Australia (ROC: 20%)
ROC’s withdrawal from both WA-381-P and WA-382-P was effective 27 April.
4.8 Cabinda Onshore South Block, Angola (ROC: 10%)
The Castanha-2 appraisal well is expected to commence drilling during 3Q 2010.
Initial activities are also expected during 3Q 2010 for a 169km2 3D seismic acquisition programme (overlapping the north of Castanha-1 discovery) to define new exploration leads and assist with mapping the Castanha-1 discovery.
4.9 Belo Profond Block, Offshore Madagascar, Mozambique Channel (ROC: 75% & Operator) and Juan de Nova Maritime Profond Block, Mozambique Channel (ROC: 75% & Operator)
Planning continues for a potential 8,000km 2D seismic survey, which is anticipated to commence during 3Q 2010.
The farmin opportunity continues to be promoted.
4.10 Block H, Offshore Equatorial Guinea (ROC: 37.5% & Technical Manager)
Drill planning activities continued during the Quarter. The farmin opportunity continues to be promoted.
4.11 Offshore Mauritania (ROC: 2 - 5.49%)
The Cormoran-1 exploration well in Block 7 is planned to commence during 3Q 2010 and a drill rig has been contracted. Cormoran-1 is planned to be followed by an exploration well in Block C6 (most likely Gharabi-1).
The sale of ROC’s Mauritanian Assets continues to be promoted.
5. CORPORATE
5.1 Health, Safety, Environment and Community ("HSEC") Issues
Two lost time injuries ("LTI") took place during the Quarter. At BMG, a LTI occurred on the contracted supply vessel when a crew member placed his hand in a "pinch point" at a door hinge when another crew member shut the door. At Zhao Dong, a "non-work" related LTI occurred when a contractor slipped while descending a bunk-bed ladder in the accommodation quarters.
There were three minor reportable environmental incidents relating to containment issues at ROC-operated assets during the Quarter.
Safety inspections took place at BMG and Zhao Dong during the Quarter. At BMG, the National Offshore Petroleum Safety Authority ("NOPSA") performed an inspection on the Crystal Ocean FPSO. At Zhao Dong, a combined inspection was performed by the Chinese State Administration for Worker Safety and the Chinese Offshore Operations Safety Office. The inspections did not identify any significant issues at either ROC-operated facility. Chinese authorities commended ROC for the continuing improvement in HSEC management at the Zhao Dong field.
During the Quarter, ROC entered a partnership with the Clontarf Foundation. The Foundation seeks to improve the education, discipline, self esteem, life skills and employment prospects of young Aboriginal men and by doing so, equip them to participate more meaningfully in society. The Foundation’s programmes are delivered through a network of football academies, each of which operates in partnership with a school or college. The Foundation operates academies in Geraldton (near the Cliff Head oil field in Western Australia) and Bairnsdale (near the BMG field in Victoria).
The Company compiled and submitted its response for the 2010 Carbon Disclosure Project ("CDP") during the Quarter, fulfilling one of the objectives outlined in ROC’s inaugural Sustainability Report that was released in May 2010.
5.2 Annual General Meeting
ROC's Annual General Meeting was held at 11.00am on Thursday 13 May 2010 at the National Maritime Museum in Darling Harbour, Sydney.
6. FINANCIAL
At Quarter-end ROC had net cash of US$52.7 million: US$102.2 million of cash offset by gross debt of US$49.5 million.
6.1 Production (Working Interest)
|
2Q 2010 |
1Q 2010 |
YTD |
% Change (1Q10 to 2Q10) |
Oil Production (BBL) |
|
|
|
|
Zhao Dong C&D Fields |
370,833 |
275,597 |
646,430 |
35% |
Zhao Dong C4 Field |
31,964 |
2,987 |
34,951 |
970% |
Cliff Head |
151,206 |
152,514 |
303,720 |
(1%) |
Blane |
83,319 |
113,677 |
196,996 |
(27%) |
BMG |
41,309 |
137,778 |
179,087 |
(70%) |
Enoch |
41,259 |
64,460 |
105,719 |
(36%) |
Chinguetti |
23,225 |
24,996 |
48,221 |
(7%) |
Other |
98 |
113 |
211 |
(13%) |
Total Oil Production |
743,213 |
772,122 |
1,515,335 |
(4%) |
Gas Production (MSCF) |
|
|
|
|
Enoch |
1,769 |
28,456 |
30,225 |
(94%) |
NGL Production (BOE) |
|
|
|
|
Blane |
3,304 |
3,169 |
6,473 |
4% |
Total BOE |
746,812 |
780,034 |
1,526,846 |
(4%) |
BOEPD |
8,207 |
8,667 |
8,436 |
(5%) |
6.2 Sales
|
2Q 2010 |
1Q 2010 |
YTD |
Oil Sales (BBLS) |
BOE |
US$’000 |
BOE |
US$’000 |
BOE |
US$'000 |
Zhao Dong C&D Fields |
252,441 |
19,510 |
208,461 |
15,018 |
460,902 |
34,528 |
Zhao Dong C4 Field |
32,404 |
2,434 |
262 |
19 |
32,666 |
2,453 |
Cliff Head |
150,902 |
11,671 |
153,195 |
11,566 |
304,097 |
23,237 |
BMG |
106,572 |
8,736 |
75,130 |
5,543 |
181,702 |
14,279 |
Enoch |
47,609 |
3,798 |
74,344 |
5,703 |
121,953 |
9,501 |
Chinguetti |
28,507 |
2,306 |
18,657 |
1,450 |
47,164 |
3,756 |
Blane |
27,832 |
2,397 |
107,636 |
8,409 |
135,468 |
10,806 |
Other |
98 |
7 |
113 |
9 |
211 |
16 |
Total Oil Sales |
646,365 |
50,859 |
637,798 |
47,717 |
1,284,163 |
98,576 |
Gas Sales (MSCF) |
|
|
|
|
|
|
Enoch |
1,769 |
1 |
28,456 |
149 |
30,225 |
150 |
NGL Sales (BOE) |
|
|
|
|
|
|
Blane |
71 |
(15) |
31,970 |
1,481 |
32,041 |
1,466 |
Total Sales |
646,731 |
50,845 |
674,511 |
49,347 |
1,321,242 |
100,192 |
6.3 Expenditure Incurred
|
2Q 2010 US$'000 |
1Q 2010 US$'000 |
YTD US$'000 |
Exploration |
|
|
|
Mozambique Channel |
627 |
539 |
1,166 |
New Zealand |
620 |
- |
620 |
China |
304 |
379 |
683 |
Australia |
262 |
459 |
721 |
Equatorial Guinea |
134 |
136 |
270 |
Angola |
25 |
(999) |
(974) |
Mauritania |
(133) |
133 |
- |
Other |
865 |
18 |
883 |
Total Exploration |
2,704 |
665 |
3,369 |
Development |
|
|
|
Zhao Dong C&D Fields |
7,645 |
1,373 |
9,018 |
Zhao Dong C4 Field |
1,230 |
661 |
1,891 |
BMG |
989 |
(226) |
763 |
Chinguetti |
12 |
(22) |
(10) |
Blane |
(10) |
- |
(10) |
Enoch |
- |
3 |
3 |
Total Development |
9,866 |
1,789 |
11,655 |
Total Exploration & Development |
12,570 |
2,454 |
15,024 |
6.4 Hedging
Remaining hedge positions from 30 June 2010 to 31 December 2011 are:
|
Brent Oil Price Swaps |
|
Volume |
Weighted Average Brent Price USD/BBL |
2010 |
561,993 |
67.03 |
2011 |
875,997 |
63.71 |
|
1,437,990 |
65.01 |
Hedge book mark-to-market valuation at 30 June 2010 was a liability of US$17.8 million.
7. POST QUARTER EVENTS
7.1 PEP38524, Offshore Taranaki, New Zealand (ROC: 20%)
On 23 July, Roc Oil (Tasman) Pty Limited, a wholly owned subsidiary of ROC, exercised an option under the existing farmin agreement to acquire a further 5% in PEP38524 thereby taking its participating equity interest in the permit to 20%.
7.2 BMG Project Litigation Update
A court ordered mediation in respect of the BW Offshore Claim against the BMG Joint Venture has been scheduled for 9 August 2010. The mediator has been agreed between the parties as Ian Callinan, QC. The outcome of the mediation is to be advised to the Federal Court by 17 August. If no agreement is reached, the trial is set down to commence on 30 August.
8. FURTHER INFORMATION
For further information please contact ROC's Chief Executive Officer, Bruce Clement, on:
Phone: (02) 8023 2000 Email: bclement@rocoil.com.au
Facsimile: (02) 8023 2222 Web Site: www.rocoil.com.au
Address: Level 14, 1 Market Street, Sydney, NSW 2000, Australia
For further information see: Stock Exchange Release 26.07.10